Learning Hub Guide
Planning Permission vs Permitted Development
Understand the difference between planning permission and permitted development before starting building work on your property.
Overview
Understand the difference between planning permission and permitted development before starting building work on your property.

What this guide covers
Understand when planning permission or permitted development may apply.
Go to section →Key limitationsCheck size, position, use and property restrictions before relying on permitted development.
Go to section →Approvals & recordsKeep decisions, drawings and approvals together for future reference.
Go to section →When to get adviceSeek professional guidance where the proposal or planning position is unclear.
Go to section →Planning route
The first question for many home-improvement projects is whether the proposal needs a planning application or can proceed under permitted development rights. These are not two different standards of workmanship or two versions of Building Regulations. They are different routes through the planning system. In England, permitted development rights are a national grant of planning permission for specified types of development, provided every relevant limitation and condition is met. If the proposal does not qualify, planning permission may need to be obtained from the local planning authority before work starts.
What is planning permission?
Planning permission is the formal consent used where proposed development is not already authorised through permitted development or another planning route. For a typical alteration or extension to a house, this may involve a householder planning application. The local planning authority considers the proposal against the development plan and other material planning considerations, which can include its scale and appearance, relationship with the existing property, effects on neighbouring amenity and the character of the surrounding area.
Needing a planning application does not mean that a project is unsuitable. It simply means the proposal requires assessment through the planning system. In some cases a homeowner may deliberately choose a design that requires an application because it works better for the property than forcing the project within permitted development limits.
What are permitted development rights?
Permitted development rights allow certain development to take place without making a conventional planning application. For householders, the principal rights are contained in Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015, as amended. Different Classes cover different work. Class A, for example, covers certain enlargements, improvements and alterations to a house, while other Classes deal with roof enlargement, roof alterations, porches and buildings within the curtilage.
The important word is permitted. A project only benefits from the right when it satisfies all of the applicable rules. It is therefore unsafe to treat permitted development as a general rule that “small extensions do not need planning”. Size is only one consideration. Position, height, previous enlargement, the original house, the property’s planning history, designated land and other restrictions can all change the position.
Check whether the property has the relevant rights
Householder permitted development rights primarily concern houses. They do not apply to flats and maisonettes in the same way, and some homes created through particular permitted-development changes of use do not subsequently benefit from the ordinary householder rights. A planning condition attached to an earlier permission can also restrict development, while a local planning authority can remove specified rights through an Article 4 Direction.
This makes the property itself the starting point. Before relying on permitted development, check its planning history, whether it is listed, whether it lies within a conservation area or other designated land, and whether relevant conditions or Article 4 restrictions apply. Properties within the South Downs National Park and character or historic areas across Hampshire and West Sussex can require particular attention because national permitted-development rules contain additional restrictions for designated land and local planning considerations may also be relevant where an application is required.
The “original house” can change the answer
Permitted development rules frequently refer to the “original dwellinghouse”. Broadly, this means the house as originally built or, if it predates 1 July 1948, as it stood on that date. This matters because extensions added by previous owners can count when assessing what further enlargement is permitted.
A homeowner can therefore purchase a house that appears to have plenty of physical space for an extension but has already used some of the relevant permitted-development allowance. Planning history, historic mapping, previous drawings and the existing building should be considered where the original form is uncertain. The fact that the current owner did not construct the earlier extension does not reset the planning position.
Some projects involve more than one permitted-development Class
A proposal should be considered as a whole. Government technical guidance explains that where an extension also alters the existing roof, the work may need to satisfy the requirements applying to both the extension and the roof alteration. Similar care is needed where several elements of a wider project are being undertaken together.
This is another reason not to decide the planning route from a single measurement or an online diagram. Establish exactly what is being changed, then test each relevant element against the current rules. Where the design changes during development, the planning assessment should be revisited rather than assuming the original conclusion still applies.
Prior approval sits within permitted development
Some permitted-development rights contain a prior-approval process. A common domestic example is the larger-home-extension procedure for certain single-storey rear extensions. Under the current national framework, this can potentially apply where a rear extension projects beyond the standard Class A depth but remains within the larger-extension limits: over 4 metres and up to 8 metres for a detached house, or over 3 metres and up to 6 metres for another house, subject to the other requirements.
This is still permitted development, but it is not a route where the homeowner simply starts work. The local planning authority must be notified and adjoining neighbours are consulted in accordance with the procedure. The required process needs to be completed before construction begins. Prior approval should therefore be identified at programme stage rather than discovered after materials or trades have been booked.
Permitted development is not the same as “no paperwork”
Even where a conventional planning application is unnecessary, it can be sensible to obtain documentary confirmation of the planning position. A proposed Lawful Development Certificate can provide a formal decision from the local planning authority about whether the proposed work is lawful for planning purposes. This can be valuable where the permitted-development assessment is complex or where a clear record may later be needed for a sale, refinancing or future alteration.
The certificate only has value in relation to the proposal accurately described in the application. If the design subsequently changes, the effect of that change should be checked. Drawings used to establish lawfulness should therefore correspond with what is actually intended to be built.
Planning and Building Regulations are separate
A permitted-development conclusion does not remove the need to consider Building Regulations. Most house extensions require Building Regulations approval, and other requirements can also apply, including the Party Wall etc. Act 1996, listed-building consent, drainage or sewer arrangements, title restrictions and project-specific approvals. Each regime deals with a different issue.
For a wider explanation of how these approvals fit into an extension project, see our Complete Guide to House Extensions. The practical objective is to identify the planning route and the other required approvals before the construction programme is committed.
Which route should a homeowner take?
Start with the proposed work and the planning status of the property. If the proposal clearly satisfies the relevant permitted-development provisions and the rights have not been restricted, permitted development may provide the appropriate route. Where the proposal exceeds those limits, the rights do not apply, or the homeowner wants a design outside them, a planning application may be appropriate. Where the position is uncertain, obtain advice from the relevant local planning authority or an appropriately competent planning professional rather than relying on assumptions.
DMP Buildtech’s role as a building contractor is to make sure the construction scope is based on a clear and workable approval position. Establishing that route early gives the designer, contractor and homeowner the same starting point and reduces the risk of redesign, delay or unauthorised work once construction has begun.
Practical point: “permitted development” does not mean that planning law does not apply. It means the proposed work is relying on an existing national grant of planning permission and must satisfy the conditions and limitations of that grant. If the position is uncertain, establish it before starting work.
Key limitations
Permitted development for householders is controlled by a detailed set of limitations and conditions. A proposal can appear modest but still fall outside the permitted-development rules because of its position, height, relationship to a boundary, previous enlargement of the house or the status of the land. The safest approach is therefore to test the complete proposal against the current rules rather than relying on one headline measurement.
The 50% curtilage limit is often misunderstood
Under Class A, development is not permitted where the total area of ground covered by buildings within the curtilage of the house—other than the original house—would exceed 50% of the total curtilage area, excluding the ground area of the original house. Existing additions and other relevant buildings can therefore matter when assessing a new extension.
This is not simply a rule allowing an extension to occupy half of the current garden. The calculation is tied to the original dwellinghouse and the relevant curtilage. Previous extensions and buildings can consume part of the available area. On an altered property, establishing the original footprint and relevant site area may therefore be necessary before relying on the rule.
Rear projection depends on the type of house and route used
For the standard Class A route, a single-storey rear extension can generally project no more than 4 metres beyond the rear wall of the original house for a detached dwellinghouse and no more than 3 metres for another dwellinghouse, subject to the remaining limitations and conditions.
The larger-home-extension prior-approval route can potentially increase those depths to a maximum of 8 metres for a detached house and 6 metres for another house. However, the larger-extension procedure has its own requirements and cannot be treated as an automatic additional allowance. The local planning authority notification and neighbour-consultation process must be completed as required before work begins.
Where the original rear wall is stepped or the proposal wraps around the building, establishing where the relevant rear wall lies can become less straightforward. Complex footprints should be assessed from accurate existing and proposed drawings rather than simplified assumptions.
Height and eaves restrictions matter
Class A contains controls on the height of an enlargement. An extension must not exceed the height of the highest part of the existing roof, and the height of its eaves must not exceed the eaves of the existing house. Additional limits apply to certain single-storey work.
For a single-storey extension, the extension must not exceed 4 metres in height. Where an extension is within 2 metres of a boundary of the curtilage, its eaves must not exceed 3 metres in height. These dimensions can materially influence roof design, particularly on narrow plots or where the proposed extension sits close to a side boundary.
Measurement rules matter as well. Sloping sites, raised ground and unusual existing roof forms can make a seemingly simple height check more complicated. Dimensions should be established from the appropriate ground level and the relevant parts of the existing and proposed building.
Side extensions have additional restrictions
A side extension cannot simply use the rear-extension allowances. Under Class A, a side enlargement is subject to specific limitations. It must be single storey, its width must not exceed half the width of the original house, and it is subject to the relevant height controls. The proposal also needs to satisfy the other Class A conditions.
On Article 2(3) land—which includes conservation areas, National Parks, Areas of Outstanding Natural Beauty/National Landscapes, the Broads and World Heritage Sites—Class A rights are more restricted. In particular, an enlargement extending beyond a wall forming a side elevation of the original dwellinghouse is not permitted development under Class A on such land.
Two-storey and upper-floor extensions are more constrained
Extensions of more than one storey are subject to additional controls. Among the Class A limitations, an enlargement with more than one storey generally cannot extend beyond the rear wall of the original house by more than 3 metres. There are also restrictions relating to boundaries and designated land.
Conditions can address matters such as the roof pitch and upper-floor side-facing windows. Upper-floor windows in a wall or roof slope forming a side elevation may need to be obscure glazed and non-opening below the specified height above the internal floor level. These requirements are intended in part to address privacy and the relationship with neighbouring property.
Because multi-storey work has greater potential effects on neighbouring amenity and the appearance of the house, it is particularly important to confirm the precise permitted-development route before progressing the design.
Previous extensions count
The rules frequently measure development from the original dwellinghouse rather than the house as it exists today. An extension built decades ago can therefore affect the permitted-development assessment for a new proposal. Removing an earlier addition does not automatically mean that its history can be ignored; the proposed scheme needs to be assessed correctly against the statutory provisions and the facts of the property.
This is why planning history is useful even where the homeowner believes no application is required. Previous approvals can reveal earlier enlargement, conditions removing permitted-development rights or other facts relevant to the current proposal.
Designated land can reduce the available rights
Permitted-development rights are more restricted in certain protected locations. For DMP Buildtech’s operating area, the South Downs National Park is particularly relevant, alongside conservation areas and listed or historic properties found across Hampshire and West Sussex. A proposal that could potentially proceed under permitted development at one address may require a different approach at another.
Conservation-area status does not mean every alteration automatically needs a planning application, but it can affect which permitted-development rights are available. Article 4 Directions can remove further specified rights locally. Listed buildings are subject to a separate listed-building-consent regime where works affect their special architectural or historic interest, so planning permission or permitted development should never be treated as the only consideration.
Materials and appearance can be controlled
Class A includes conditions relating to external appearance. Materials used in exterior work are generally required to be of a similar appearance to those used in the construction of the exterior of the existing dwellinghouse, subject to the detailed provisions and exceptions in the legislation.
This does not mean every product must be an exact replica, but the condition should be considered during specification. Where a homeowner wants a deliberately contrasting extension, extensive glazing or a materially different architectural treatment, the design should be checked against the permitted-development conditions rather than assuming that dimensional compliance alone is enough.
Permitted development does not override other controls
Even a proposal that satisfies the planning limitations can still be affected by other requirements. Building Regulations, the Party Wall etc. Act 1996, listed-building consent, drainage and sewer requirements, restrictive covenants and rights affecting neighbouring land are separate matters. A lawful planning route does not grant a right to build across somebody else’s land or ignore other statutory duties.
Similarly, the permitted-development assessment should not be used as a structural or technical design check. A 3-metre or 4-metre projection being permitted in planning terms says nothing about the foundation design, structural opening, roof construction, drainage or thermal performance required to build it safely and compliantly.
Use the limitations as a design framework, not a target
It is tempting to design immediately to the maximum permitted-development dimensions, but the largest envelope is not always the best extension. Internal layout, daylight to the existing rooms, garden space, neighbouring property, roof geometry, drainage and buildability can all justify a smaller or differently configured scheme.
Where a better design falls outside permitted-development limits, a planning application may be preferable. Conversely, where the proposal sits comfortably within the rights, accurately documenting that position can give the project a clearer route forward.
Practical point: never assess permitted development from one measurement alone. Check the original house, previous additions, curtilage coverage, rear or side position, height, boundaries, designated-land status and any property-specific restrictions together before relying on the right.
Approvals & records
Once the planning route has been established, the next task is to create a clear record of why that route applies and to keep the documents that support it. This matters whether the project has full planning permission, householder planning permission, prior approval or is intended to proceed under permitted development without a conventional planning application. Good records reduce uncertainty during construction and can become important years later when the property is sold, refinanced or altered again.
Keep the planning decision and approved drawings together
Where planning permission has been granted, retain the decision notice and the drawings and documents that formed part of the approved application. The permission may contain conditions that need to be discharged or complied with, and those conditions should be read alongside the drawings rather than treating the decision notice as a simple permission to build anything broadly similar.
The construction team should be working from the correct approved information. If a design changes after permission has been granted, the effect of that change should be considered before it is built. Depending on its nature, a change may be capable of being dealt with through an appropriate amendment procedure, while a more substantial change may require a further application. Do not assume that because the overall extension remains similar, every alteration is automatically covered by the original permission.
Document the basis for permitted development
Where the project relies on permitted development, there may be no conventional planning decision notice unless the particular right requires prior approval or the homeowner applies for a Lawful Development Certificate. That makes it especially useful to retain the information used to reach the permitted-development conclusion.
A sensible record can include existing and proposed drawings, dimensions, photographs, relevant planning history, notes on the original dwellinghouse, evidence of any previous extensions and the current permitted-development provisions considered. If the property lies within a conservation area, National Park or another designated area, retain the information used to establish how those restrictions affect the proposal.
This is not about creating paperwork for its own sake. If the planning position is questioned later, contemporaneous drawings and records are much more useful than trying to reconstruct what was considered several years after the extension was built.
A Lawful Development Certificate can provide useful certainty
A homeowner who intends to rely on permitted development can apply to the local planning authority for a proposed Lawful Development Certificate. The authority considers whether the described proposal would be lawful for planning purposes. Where issued, the certificate creates a formal record of that conclusion based on the information submitted.
This can be particularly valuable where the property has a complicated planning history, the proposed extension is close to one of the permitted-development limits, or the homeowner wants documentary evidence for a future purchaser or lender. It can also reduce disagreement later about whether the work was intended to fall within permitted development.
The certificate should match the project that is actually built. If dimensions, position, roof form or other relevant details change, the planning implications of the change should be checked rather than assuming the certificate automatically covers the revised design.
Prior approval produces its own record
Where a permitted-development right requires prior approval, retain the application, plans, correspondence and the local planning authority’s decision or other formal outcome. The larger-home-extension procedure is a familiar domestic example. Because neighbour consultation forms part of that process, the project programme should allow the statutory procedure to run before work starts.
Prior approval is not interchangeable with a Lawful Development Certificate. They perform different functions within the planning system. The important practical point is that the project file should clearly show which route was used and that any procedure required by that route was completed.
Planning conditions need active management
Some planning permissions contain conditions controlling matters such as materials, landscaping, hours, details or the timing of particular actions. Conditions can be expressed differently: some require information or approval before development begins, while others control the work or the completed development.
Read the conditions early. A project can be delayed if a condition requiring approval before a particular stage is only discovered when the contractor is ready to proceed. Where details need to be submitted to the local planning authority, keep the submission and the authority’s written response with the project records.
The contractor should also be told about conditions that affect site operations or the physical work. Planning compliance cannot be managed effectively if the relevant information remains only in an email account or planning consultant’s file.
Keep planning and Building Regulations records separate but coordinated
Planning approval does not demonstrate Building Regulations compliance, and a Building Regulations completion certificate does not prove that the work complied with planning permission. Both records may relate to the same extension, but they answer different questions.
A good property file therefore keeps both sets of information. Building-control records can include the application or notice, drawings and specifications, structural calculations, inspection correspondence, completion documentation and relevant certificates. For a fuller explanation of the construction compliance side, see our Building Regulations Explained guide.
Record the final built arrangement
Drawings prepared before construction are useful, but they may not always show every detail of the completed building. Where sensible, retain an accurate record of material changes made during construction. Photographs taken before work is covered can also be useful for foundations, drainage routes, structural connections, insulation, services and other concealed construction.
These photographs do not replace required inspections, certificates or design information, but they can make later maintenance and alteration considerably easier. Knowing where a drain runs or where a structural member is positioned can prevent unnecessary opening-up years later.
Keep specialist certificates and approvals
An extension may generate documents beyond planning and general building control. Depending on the work, the completion file might include electrical certification, gas-related records, commissioning information, window or door documentation, warranties, structural information and approvals associated with drainage or public sewers. Party Wall etc. Act documentation, where applicable, should also be retained separately.
Not every project will require every document. The aim is to preserve the records that demonstrate what was approved, designed, installed, inspected or commissioned for that particular extension.
Why records matter when a property is sold
Property transactions commonly involve enquiries about alterations and extensions. A future purchaser’s solicitor may ask for planning permissions, evidence that work was permitted development, Building Regulations completion documentation and other relevant certificates. Missing paperwork does not automatically establish that work was unlawful or defective, but it can create additional questions and delay while the position is investigated.
Maintaining an organised completion file from the outset is much easier than trying to obtain historic information during a sale. Public planning records can help, but they may not contain every construction or compliance document the homeowner needs.
Use the planning portal as a record, but keep your own copy
Local authority online planning systems are valuable for checking applications, decisions and published documents. However, homeowners should still retain their own project records. Website systems can change, older files may be archived differently and not every document relevant to construction will necessarily appear in the public planning record.
For DMP Buildtech projects, clear information also helps establish the contractor’s scope. Approved drawings, specifications and conditions provide a defined basis for pricing and construction and make it easier to identify when a later client request represents a change to the agreed work.
Create one property completion file
A practical approach is to create a single digital and, where useful, paper file for the project. It can contain the planning route and decision, approved or lawful-development drawings, conditions and approvals, Building Regulations information, structural design, relevant certificates, warranties, photographs and a record of significant changes.
The file should be handed over and retained with the property rather than disappearing into separate contractor, designer and homeowner inboxes. This supports future maintenance and gives subsequent owners and professionals a clearer understanding of what was done.
Practical point: before treating an extension project as closed, check that the final property file answers four questions: what was approved, what was actually built, what was inspected or certified, and what information should a future owner or contractor know about the work.
When to get advice
Many straightforward home projects can be understood using the government’s permitted-development guidance and the local planning authority’s published information. However, planning becomes less straightforward when the property, proposal or planning history introduces uncertainty. In those situations, obtaining advice before committing to drawings, materials or construction can prevent a relatively small planning question becoming an expensive problem on site.
Get advice when the permitted-development position is unclear
If there is genuine doubt about whether every relevant limitation and condition is satisfied, do not rely on a general assumption that the work is permitted development. This is particularly important where dimensions are close to the statutory limits, the existing house has an unusual footprint, earlier extensions have been added, or it is difficult to establish the form of the original dwellinghouse.
A planning professional can help interpret the proposal against the legislation, while the local planning authority can provide the formal planning functions available in its area. Where certainty about lawfulness is important, a proposed Lawful Development Certificate can provide a formal determination rather than relying solely on informal advice.
Historic and altered properties deserve additional checks
Older properties often have a longer history of alterations, outbuildings and changes of use. Drawings may be incomplete and the building visible today may differ substantially from the original dwellinghouse used by the permitted-development rules. Before designing around a presumed allowance, establish as far as reasonably possible what has already changed.
Historic character can introduce further considerations. A listed building is subject to listed-building controls, and work affecting its special architectural or historic interest may require listed building consent independently of ordinary planning permission. Conservation-area status can affect permitted-development rights, and an Article 4 Direction can remove specified rights that would otherwise exist.
Across DMP Buildtech’s Hampshire and West Sussex operating area, this is particularly relevant to older settlements and properties within or close to the South Downs National Park. The exact planning authority and designations should be checked for the individual address rather than inferred from the nearest town.
Seek advice before buying a property for a planned extension
If the ability to extend is an important reason for purchasing a property, investigate the planning position before assuming the project is achievable. Estate-agent particulars, neighbouring extensions and informal comments are not planning approvals. A neighbouring house may have a different planning history, original footprint, designation or application decision.
Early feasibility advice can consider the likely planning route, site constraints and whether the desired accommodation appears realistic. This does not guarantee a future planning decision, but it can identify obvious issues before the buyer bases a major financial decision on an untested assumption.
Neighbouring extensions are useful context, not a precedent
Homeowners frequently point to a nearby extension as evidence that their own proposal should be allowed. It can be useful to inspect the public planning record for comparable properties, but another project does not automatically create a right to reproduce it. It may have been approved under a different policy context, built under permitted development, constructed before current rules applied or relate to a materially different property.
Where a planning application is required, consistency and local character can be relevant considerations, but each proposal is assessed on its own facts and against the applicable planning framework. Advice is particularly useful where the intended design relies heavily on what has happened elsewhere in the street.
Get planning input before fixing a difficult design
Planning should inform design rather than simply test a completed design at the end. If the property is constrained by neighbouring windows, a prominent corner position, conservation considerations, unusual levels or a sensitive landscape setting, early planning input can help the designer concentrate effort on a realistic solution.
This is also relevant where a homeowner is deciding between a smaller permitted-development scheme and a larger or architecturally different proposal requiring permission. The correct choice is not automatically the route with less paperwork. The better route is the one that produces an appropriate, usable project with a clear planning basis.
Use pre-application advice where it adds value
Many local planning authorities offer a pre-application advice service, although the scope, fees and response arrangements vary. This can be useful for proposals where an early view on planning issues could influence the design before a formal application is submitted.
Pre-application advice is not planning permission and cannot guarantee the outcome of a later application. Policies, information and circumstances can change, and a formal application goes through its own assessment. Nevertheless, on an appropriate project it can identify issues early and help improve the quality of the eventual submission.
Know when specialist planning advice is appropriate
A planning consultant may be particularly useful where the planning history is complicated, permitted-development rights have been restricted, the site is sensitive, an application has previously been refused or the project requires a more detailed planning case. An architect or architectural designer may coordinate the physical design and planning drawings, but the professional team should match the complexity of the project.
For heritage assets, specialist conservation advice may also be appropriate. Structural engineers, building-control professionals and other technical consultants perform different roles; a structural calculation cannot resolve a planning question, just as planning permission does not demonstrate structural compliance.
Ask before making material changes to an approved scheme
A common risk arises after permission has been granted but before or during construction. A homeowner may want to move an opening, alter a roof, change external materials or increase a dimension. Some changes may be minor in planning terms, while others can affect the basis on which permission was granted or the permitted-development assessment.
Do not wait until completion to ask whether a significant change was acceptable. Check the planning implications before the revised work is carried out and use the appropriate amendment or application process where required. This is generally easier than trying to regularise a discrepancy after the building is finished.
Take advice before enforcement becomes the issue
If work has been carried out and there is concern that the required planning permission was not obtained or that the development differs materially from an approval, obtain appropriate planning advice promptly. Planning enforcement has its own statutory framework, evidence requirements and time limits, and the correct response depends on the facts of the case.
A building contractor should not attempt to give legal assurances about an uncertain planning status. The useful first step is to establish what was approved or relied upon, what was actually constructed and what the planning record shows, then obtain specialist or local-authority guidance where necessary.
Separate planning advice from construction advice
DMP Buildtech can help clients understand how an approved design translates into practical construction, identify buildability issues and coordinate the building scope. That does not replace the role of the local planning authority or a planning professional where a formal interpretation or planning strategy is required.
Keeping those responsibilities clear protects the project. The planning route should establish what can lawfully be built in planning terms; the designer and engineers should define the technical solution; building control deals with Building Regulations; and the contractor should construct the agreed work competently from the correct information.
Bring advice into the project early enough to be useful
The best time to resolve a planning uncertainty is before it affects procurement or construction. Once structural steel, windows or roof components have been ordered, a design change can have consequences far beyond the planning drawing. Early decisions also allow quotations to be based on a stable scope rather than assumptions.
For homeowners planning an extension, our Complete Guide to House Extensions explains how planning, design, budgeting, construction sequencing and Building Regulations fit together. The planning route is one part of that wider pre-construction process.
Practical point: seek advice whenever the answer depends on an assumption you cannot verify. Establishing the planning position before design and construction commitments are made is usually simpler than resolving uncertainty after work has started.
Related services
FAQs
What is the main difference between planning permission and permitted development?
Planning permission is obtained through an application where development requires the local planning authority’s approval. Permitted development rights are an existing national grant of planning permission for specified development that satisfies all relevant limitations and conditions.
Does permitted development mean I can start building immediately?
Not necessarily. The proposal must first qualify for the relevant permitted-development right, and some rights require a prior-approval procedure. Building Regulations and other requirements can also apply independently.
How can I prove that a proposed extension is permitted development?
A proposed Lawful Development Certificate can provide a formal local-authority decision about whether the described proposal would be lawful for planning purposes. Accurate drawings and information about the property are important to that assessment.
Do previous extensions affect permitted development rights?
They can. The rules frequently assess enlargement against the original dwellinghouse, so extensions built by previous owners may affect what can be added now.
Are permitted development rights different in conservation areas or the South Downs National Park?
Some permitted-development rights are more restricted on designated land, and Article 4 Directions can remove specified rights locally. The position should be checked for the individual property and proposal.
Does planning permission mean Building Regulations are also approved?
No. Planning and Building Regulations are separate systems. A project may require both planning consent or a permitted-development basis and the appropriate Building Regulations approval.