A project that developed from an initial garage demolition and client cabin into a pool house and gym, followed by demolition of the existing residence and delivery of the new main home, with DMP Buildtech coordinating the wider works and trades as Principal Contractor.
Project overview
One appointment that developed into three major phases.
DMP Buildtech was originally appointed to demolish a prefab double garage and construct a cabin to accommodate the client during later works. The project then progressed into the pool house and gym before expanding again to include demolition of the original main residence and construction of the replacement home.
Managing a changing, multi-phase residential build.
The role extended beyond individual construction packages. DMP Buildtech coordinated site activity and liaised with the other trades as the programme developed through the cabin, pool house and gym, and ultimately the new main residence.
Residential development · Principal Contractor
Three project phases
Cabin. Pool house & gym. Main residence.
The photographic record documents how the appointment expanded from a relatively contained enabling project into a substantial residential development.
Client accommodation
Following demolition of the prefab garage, a new cabin was constructed to provide accommodation for the client during the later main-house works.
Second phase
The works progressed into construction of the pool-side building and gym, including associated groundworks and building works.
New home
The existing dwelling was demolished and replaced with the new residence, with DMP Buildtech continuing its Principal Contractor coordination role.
Scope & delivery
Principal Contractor capability demonstrated across the site.
Planning a substantial residential project?
Talk to DMP Buildtech about coordinated construction, refurbishment and Principal Contractor delivery across Hampshire and West Sussex.